

TABLE OF CONTENTS
BACKGROUND
PROPOSED WORKS AND WORK PROGRAMME
PURPOSE OF THE MANUAL
OBJECTIVES OF THE ENVIRONMENTAL
MONITORING AND AUDIT PROGRAMME
SCOPE OF THE ENVIRONMENTAL
MONITORING AND AUDIT PROGRAMME
STRUCTURE OF THE EM&A MANUAL
2 ENVIRONMENTAL MANAGEMENT SYSTEM FOR
THE CONSTRUCTION PHASE
INTRODUCTION
GENERAL
THE EM&A MANUAL
CONTRACTUAL DOCUMENTATION
CONSTRUCTION PHASE
CONSTRUCTION PHASE EM&A MANUAL
ENVIRONMENTAL MANAGEMENT PLAN
ENVIRONMENTAL PERFORMANCE REVIEW
CONSTRUCTION METHOD STATEMENT
INTRODUCTION
PROJECT ORGANISATION
Contractor
Environmental Team (ET)
Engineer or Engineer’s
Representative (ER)
Independent Environmental Checker
(IEC)
INTRODUCTION
GENERAL
ENVIRONMENTAL MONITORING
ACTION AND LIMIT LEVELS
EVENT AND ACTION PLANS
SITE INSPECTIONS
ENQUIRIES, COMPLAINTS AND REQUESTS
FOR INFORMATION
REPORTING
CESSATION OF EM&A
INTRODUCTION
METHODOLOGY AND CRITERIA
MONITORING EQUIPMENT
LABORATORY MEASUREMENT/ANALYSIS
MONITORING LOCATIONS
BASELINE MONITORING
IMPACT MONITORING
COMPLIANCE ASSESSMENT
EVENT AND ACTION PLAN (EAP)
MITIGATION MEASURES
INTRODUCTION
METHODOLOGY AND CRITERIA
MONITORING EQUIPMENT
MONITORING LOCATIONS
BASELINE MONITORING
IMPACT MONITORING
COMPLIANCE ASSESSMENT
EVENT AND ACTION PLAN (EAP)
MITIGATION MEASURES
INTRODUCTION
METHODOLOGY AND CRITERIA
MONITORING EQUIPMENT
LABORATORY MEASUREMENT/ANALYSIS
MONITORING LOCATIONS
BASELINE MONITORING
IMPACT MONITORING
COMPLIANCE ASSESSMENT
EVENT AND ACTION PLAN (EAP)
MONITORING OF TOTAL INORGANIC
NITROGEN AND UN-IONISED AMMONIA
MONITORING OF TBT/PAHS/PCBS
INTRODUCTION
WASTE MANAGEMENT PRACTICES
EM&A RECOMMENDATIONS
OBJECTIVES OF THE WASTE AUDIT
METHODOLOGY AND CRITERIA
MITIGATION MEASURES
POTENTIAL IMPACTS
RESIDUAL ENVIRONMENTAL IMPACTS
ENVIRONMENTAL MONITORING AND AUDIT
REQUIREMENTS
BASELINE MONITORING
MONITORING DURING THE CONSTRUCTION
PHASE
COMPENSATORY TREE PLANTING
RARE/RESTRICTED/PROTECTED SPECIES
GENERAL
MARINE MAMMALS
Subtidal Monitoring Equipment
SEAWALL DESIGN AND EFFECTIVENESS
EM&A RECOMMENDATIONS
ENVIRONMENTAL MONITORING AND AUDIT
INTRODUCTION
AUDITING REQUIREMENTS
RESCUE EXCAVATION AT CHOK KO WAN
ARCHAEOLOGICAL SITE
WAN TUK ARCHAEOLOGICAL SITE
INTRODUCTION
AUDITING REQUIREMENTS
MITIGATION MEASURES
SITE INSPECTIONS
EMERGENCY RESPONSE
COMPLIANCE WITH LEGAL AND
CONTRACTUAL REQUIREMENTS
ENVIRONMENTAL COMPLAINT
GENERAL
BASELINE MONITORING REPORT
EM&A REPORTS
QUARTERLY EM&A SUMMARY REPORTS
FINAL EM&A REVIEW REPORT
DATAKEEPING
INTERIM NOTIFICATION OF
ENVIRONMENTAL QUALITY LIMIT EXCEEDANCES
List of Tables
Table 5.1
EM&A Representative Air Quality Monitoring Stations
Table 5.2
Derivation of Action and Limit Levels for TSP Monitoring
Table 5.3 Action
and Limit Levels for TSP
Table 5.4 Event
and Action Plan for Air Quality
Table 6.1
Acceptable Noise Levels (ANLs)
Table 6.2
Noise Monitoring Equipment
Table 6.3
EM&A Representative Noise Monitoring Locations
Table 6.4 Derivation
of Action and Limit Levels for Construction Noise
Table 6.5 Action
and Limit Levels for Construction Noise
Table 6.6
Event and Action Plan for Construction Noise
Table 7.1 Analytical Methods to be Applied to Marine Water Quality Samples
Table 7.2
Locations of Marine Water Quality Monitoring Stations
Table 7.3
Locations of Marine Water Quality Control Stations
Table 7.4
Locations of Marine Water Quality Gradient Stations
Table 7.5 Summary
of Baseline Monitoring Programme for Water Quality
Table 7.6
Derivation of Action and Limit Levels for Marine Water Quality
Table 7.7
Action and Limit Levels for Marine Water Quality
Table 7.8
Event and Action Plan for Marine Water Quality
Table 7.9
Analytical Methods for TIN and NH3-N
Table 7.10 Locations
of Water Quality Monitoring for TBT/PAHs/PCBs
Table 7.11
Method for Laboratory Analysis of Water Samples
Table 7.12 Summary of Water Quality Monitoring Program
Table 7.13
Limit Levels for Water Quality
Table 9.1
Event and Action Plan for White Bellied Sea Eagles
Table 10.1
Summary of Equipment and Personnel Requirements for Marine Mammals Monitoring
Table 10.2
Summary of Equipment and Personnel Requirements for Subtidal Monitoring
List of Figures
Figure 1.1 Layout
of Work Site
Figure 1.2 Locations
of Air Sensitive Receivers
Figure 1.3 Locations
of Noise Sensitive Receivers
Figure 1.4 Locations
of Water Quality Sensitive Receivers
Figure 3.1 Project Organisation
Figure 5.1 Locations
of Air Quality Monitoring Stations
Figure 6.1 Locations
of Noise Monitoring Stations
Figure 7.1 Locations
of Water Quality Monitoring Stations
Figure 7.2 Locations
of TBT/PAHs/PCBs Monitoring Stations
Figure 9.1 Location
of White-bellied Sea Eagles Monitoring
Figure 10.1 Locations
of Marine Mammals Monitoring
Figure 10.2 Locations
of Subtidal Monitoring
List of Appendices
Appendix B Environmental
Mitigation Implementation Schedule (EMIS)
Appendix C Sample
Date Record Sheet for Air Quality, Noise and Water Quality Monitoring
Appendix D Environmental
Complaint Handling Procedures
Appendix E Complaint
Record Form